Tuesday, November 05, 2013

The first User Story for your next Project

For your next project, consider adding this story to the very first sprint:

As an administrator I want to install the program with an installer so that I can have everything in place without manual setup.

Acceptance criteria:

  • Application should run and show an empty screen
  • Application should produce a log file that shows debug diagnostic information that can be used to trace through application runtime (timestamp, thread, logging level, component, message). Any fatal errors during start-up should be recorded with helpful diagnostic details.
  • Any prerequisites for the installer must be known in advance or bundled with the installer
  • The installer should have a minimal user-interface and optionally support running unattended
  • The installer should put a shortcut on the desktop and start menu

Sure, this is great, but why should this be the first story in my project?

The short answer is this is the best time to do this. An installer created at the beginning of the project is often very simple as it will likely only be a handful of files. If you’ve ever written an installer, you’ll know that it can be a lot of work establishing all your dependencies and user-interface. If you wait until the end of the project when time is often a critical resource, you’ll fall into the trap of dropping this feature.

The beginning of your project is also a really good time to start thinking about deployment. By creating an installer you’ll have a packaging mechanism for your testers and business stakeholders and every time they install your application they will be regression testing the deployment. Bugs will be found, and the installer will get better and more robust as the project advances. From a development perspective you might think of this as re-work. Try to break out of that mindset and think of it more like spreading the work over the project in small increments.

As a final note, you may notice that some of the requirements refer to non-functional requirements like diagnostic logging. I’ve found this is a great way to set scope for the developers when referring to the initial “empty screen” and has an added benefit that lets testers know the location of the log files. Also, it allows you to associate defects for weird start-up errors and crashes to a User Story.

Happy coding.

Wednesday, October 16, 2013

Advance WorkItems to next state on check-in

Nearly two years ago, I had a project where we used whiteboard and post-it notes for our Kanban board. Perhaps one of my favourite aspects of using a whiteboard was the non-verbal communication that occurred between team members: when a developer would finish a task, she would stand-up from her desk, take a deep breath and well deserved stretch then rip her post-it note from the In-Progress column, slap it into the Ready-for-test column and then yank one from the Next column. Everyone on the team would look up, smile and go back to coding.

Alas, whiteboards and post-it notes only work when all team members can see the board and when you’re teams are remote you will need a software solution. Our organization is big on TFS, and I’ve found much luck using SEP Teamworks to simplify the data and present it in a Kanban fashion.

One of the challenges with using software for task tracking is that it loses that tacit capability. Choosing the wrong tool can mean you spend more time managing the tool than building software.

Here’s a quick post that illustrates how you can leverage features of TFS workflow to automate your Kanban process a bit, so you don’t have to harass your team members so much.

The xml schema for our User Stories, Bugs and Tasks contains elements that describe fields, user-interface and workflow. The workflow element is interesting because it allows us to define the supported transitions between states and default values for fields in each state. It also supports this sweet little addition that will automatically transition a work-item to a different state simply by including the following Action in the Actions element:

<TRANSITION from="In Development" to="Ready for Test">
  <REASONS>
    <DEFAULTREASON value="Development Complete" />
  </REASONS>
  <FIELDS>
    <FIELD refname="System.AssignedTo">
      <ALLOWEXISTINGVALUE />
      <EMPTY />
    </FIELD>
  </FIELDS>
  <ACTIONS>
    <ACTION value="Microsoft.VSTS.Actions.Checkin" />
  </ACTIONS>
</TRANSITION>

Although the schema suggests that it would allow custom actions to be plugged in here, only the Microsoft.VSTS.Actions.Checkin action is supported.

To take advantage of this feature, simply associate your work items to your check-in and mark the action as “Resolve”.

TFS_AssociateWorkItems

Thursday, September 12, 2013

Kanban, TFS style.

I’ve been building up a system of tracking tasks using User Stores in TFS for almost two years and I’ve been blogging as I go. Over time, I’ve written several short emails to colleagues pointing them to the Kanban tag of my blog, but that tag list is a bit heavy. Here’s a quick recap of helpful posts that can get you up and running.

Getting Started

If you’re a developer, team lead or architect – you should start here.

  1. My first month with Kanban – a quick walkthrough that discusses my initial observations with Kanban. Old school, using a whiteboard and sticky-notes.
  2. Using Kanban with TFS – a high level overview of the process I’ve adopted for tracking Tasks in TFS using Kanban columns. Provides an overview of customizing work-items.
  3. Configuring SEP Teamworks – a walk through how to set up SEP Teamworks, my favorite free tool for viewing TFS items in a sticky-note fashion.
  4. Using User Stories with SEP Teamworks – Revisiting my workflow slightly to adapt to using User Stories instead of just individual task tracking.
  5. Setting up Areas and Iterations – Shows you how to organize your stories into TFS Areas & Iterations, and then using SEP Teamworks features to simpli

Reporting and Querying

If you’re a project manager and you want to set up SEP TeamWorks. Please read:

  1. Working with TFS WorkItems in Excel – includes a walk through on how to set up your machine, and export queries to Excel.
  2. Configuring SEP Teamworks – a walk through how to set up SEP Teamworks, my favorite free tool for viewing TFS items in a sticky-note fashion.

Advanced Customizations

  1. What’s new in SEP Teamworks 1.0.31 – highlights some of the new improvements in the latest release: Card Editor to customize views, creating linked work items.
  2. Marking Kanban items as Blocked – demonstrates how to customize your work items to take advantage of marking items as blocked.

Tuesday, August 13, 2013

Fix your code with an “On Notice” board

OnNotice

The above comes with thanks to the On Notice Generator, and my board re-iterates a lot of the guidance found on Miško Hevery’s blog. These are code patterns and anti-patterns that I’ve encountered on many projects and have strong feelings against. Some of these are actually on my Dead to Me board, but there wasn’t a online generator.

I think it’s a good habit to start on On Notice board for your project – a list of offending code that should be cleaned-up at some point. Often, these unsightly offenders are large and tightly woven into the fabric of our code so they’re not something that can be fixed in a single refactoring. But by placing these offences on a visible On Notice board, they become goals that can fuel future refactorings.

You might not be able to fix a problem in a single session, but you can add a 2 hour research task to your backlog to understand why it exists. The output of such task might be further research tasks or changes you could introduce to shrink their influence and eventually remove all together. Sometimes I bundle a bunch of these fixing tasks into a refactoring user story, or slip a few into a new feature if they’re related. Over time, the board clears up.

Don’t forget, while you’re making these changes, write a few tests while you’re at it.

Oh, regarding Gluten-free cookies… they look like cookies, but they are most definitely not.

Monday, July 22, 2013

Thanks for Saying Thanks!

A few months back, I received a nice email from the folks at SEP for my blog notes on SEP TeamWorks. It’s nice to know that someone is paying attention:

My name is Adam Scroggin and I am the product owner for SEP TeamWorks.  I came across your blog today (http://www.bryancook.net/) and just wanted to say thanks for the write ups you did.  If there are any features you want added, feel free to contact me.

Keep on writing! Adam

Adam Scroggin | Software Engineering Manager

Appreciate the feedback, Adam. I have a few more blog posts to add regarding using the tool with TFS. I’m sure you’d be happy to learn that teams within my organization continue to adopt the tool for its ease of use.

Thursday, May 16, 2013

Working with TFS work items in Excel

Visual Studio ships with a pretty good query engine that you can use to retrieve a list of work items, but if you need to change the filter criteria frequently or calculate totals for estimates or remaining work, Visual Studio can’t cut it on its own. Fortunately, the integration between TFS and the Microsoft Office suite is fantastic and we can export our data into Excel with a few simple clicks.

Hey, if you’re reading this because you’re a project manager at my office and I sent you this link, you’ll need a few things on your machine for this to work:

  1. Download a copy of Visual Studio Team Explorer.  It’s basically a slimmed down shell of Visual Studio without all the code editing features and it includes all the goodies for you to query work items and export to Excel.  If you have Visual Studio installed, you can skip this step.
  2. You’ll need read permissions to the TFS Team Project. Reach out to your friendly IT support for this.
  3. If you’ve never connected to the TFS server before, you’ll also need the TFS Server name, Team Project Collection name, and Team Project name.

There are two ways to get TFS work items into Excel:

  • Import TFS Work Items into Excel
  • Export TFS Work Items from Visual Studio or Team Explorer into Excel

Importing TFS Work Items into Excel

Let’s assume that you’ve never connected to TFS before. Managing this from Excel is actually pretty easy.

  1. Open Excel and create a blank workbook
  2. Select the “Team” option from the Ribbon. If “Team” isn’t available in the Ribbon, you haven’t installed Team Explorer. (see above)
  3. Select the “New List”.
    Excel_TeamExplorer_Addin
  4. The Connect to Team Foundation Server dialog will appear.
    TFS_ConnectToServer
  5. Click the Servers button. The Add/Remove Team Foundation Server dialog will appear.
    TFS_AddRemoveServer
  6. Click the Add button to open the Add Team Foundation Server dialog.
    TFS_AddServerpng
  7. Fill in the server name and details provided to you by IT. You’ll know you’ve entered the right information when the Preview matches the information provided.
    TFS_AddServerpng
  8. After all the connection information is provided, select the appropriate Team Project Collection, and the Team Project that you want to use.
    TFS_SelectProject
  9. Finally a dialog appears that lets you select an existing TFS query.
    Excel_SelectQuery
  10. Once you’ve selected, the query, click OK. Voila!
    Excel_TFS_Goodness

Exporting TFS work items to Excel from Visual Studio

Exporting your favorite query from Visual Studio to Excel couldn’t be easier. Simply run the query and then select “Open in Microsoft Office –> Open Query in Microsoft Excel”

VS_ExportToExcel

Famous Last Words

Here’s a few tips with working with work items Excel:

  • At any time you can get the latest by clicking the “Refresh” button
  • If you make changes, you can push them back to the server by clicking the “Publish” button. (You’ll need write permissions for this)
  • This worksheet is tied directly to the server, so don’t forward the spreadsheet to individuals that don’t have access to the data. For this, copy the entire worksheet to another worksheet.

Thursday, February 28, 2013

Using Areas & Iterations in SEP TeamWorks

TFS supports a concept that allows you to organize your work items into different functional areas and chronological iterations, called Areas & Iterations. This post shows you how you can use these features to groom your Work Items using SEP TeamWorks.

Areas & Iterations in TFS

Areas & Iterations can be accessed from the Team Explorer.

Visual Studio 2012

TFS2012_AreasIterations

Selecting this item opens a single dialog that allows you to configure both Areas & Iterations. Note that you’ll need to be an administrator for your Team Project in order to make changes.

Areas

The following shows an example of functional areas for a product.

TFS_Iterations

Iterations

The following shows an example of Iterations.

TFS_AreasIterations

Both Areas & Iterations can be nested so you can structure them any way you want. The system is also flexible if you delete an item you’ll be prompted to select a new value work items that would be impact.

Querying Work Items based on Path

When you query Work Items, you can find all items within the hierarchy.

TFS_AreaPathQuery

Using Swim Lanes with SEP TeamWorks

SEP TeamWorks doesn’t have any built in mechanism to filter your TFS queries, but it has a fantastic feature that let’s you group content using swim lines.

Swim Lanes can be turned on any query (except hierarchical queries), simply right-click (long-press on your touch device) to open the context-menu and choose Edit Swim Lanes. You can also access the swim lanes from the Options button in the UI.

SEP_AllWorkItems

You can create Swim Lanes for most fields, assuming that the Work Items in the Query support the fields you’re grouping by:

SEP_EditSwimLanes

Here’s the same query with a swim lane enabled for Iteration Path.

SEP_AllWorkItems_with_SwimLanes

Where swim lanes really shine is you can use them to edit your work items without opening them simply by dragging them into another lane.  Here’s some great examples:

  • Bug Triage: write a query that pulls back all new bugs then use swim lanes for Severity, Priority, Found In or Triage status. 
  • Product Planning: write a query for all User Stories then use swim lanes for Area path, Iteration path, Risk, Story Points
  • Grooming the backlog: write a query for all Tasks then use swim lanes for Activity, Area, Assigned To, Remaining Effort

As you can see, with a little bit of planning and some creativity you can customize the tool to fit your needs. In the upcoming posts, I’ll look at common queries and exporting information out of TFS into other formats.

Until then, Happy Coding.

Monday, February 25, 2013

Using User Stories with SEP TeamWorks

When I first started with Kanban over a year ago, the post-it notes on my whiteboard represented Tasks and Bugs, which for the most part worked great. The two main challenges raised by the team, were:

  • Developers had a hard time visualizing related tasks, which made it difficult to organize and plan effort. We also had the risk of being unable to deploy because some related tasks were unfinished.
  • Project Managers had a hard time reporting progress on high-level features. Although they had access to the Kanban board, organizing a status report from low-level tasks and bugs wasn’t sufficient.

Kanban is intended to be an adaptive process, meaning that it’s not a full-featured methodology and you pretty much have to add your own rules and concepts to it so that you can adapt it to your needs. Other methodologies, like Scrum, have solved my problem by using User Stories to represent high-level features that you can group related tasks under. Developers could see related tasks; project managers could report progress on Stories – win / win. The only remaining challenge was how to represent User Stories on a whiteboard? (How do you associate post-it notes with a Story? Do Stories move on the board like Tasks do? If a few of the tasks for a Story are “ready for test” does the status of the Story change?)

I struggled with this challenge until I switched over to a digital Kanban board which afforded us the ability to produce different queries over the same data. We’re using TFS 2010 as a repository and SEP TeamWorks as a front-end to visualize task effort.

Querying and Displaying User Stories

The Agile Process Template used by TFS 2010 includes a User Story work item type which you can link tasks to in a Parent-Child relationship. You can write a simple query to obtain all parent-children tasks. 

TFS_DirectLinksQuery

Note that the TFS query that I’m using is a Work Items with Direct Links query, which allows me to pull back Children tasks as well as Related bugs. I also don’t nest my User Stories – this technically works within TeamWorks, but it seems a little odd and needs some further investigation.

SEP TeamWorks supports hierarchical tasks out of the box. Stories and their children are represented as swim lanes, with the first column representing the Story.  Note that because Stories are broken into swim lanes, you can’t use TeamWork’s swim lane feature to further refine the query. If this is something you want, you’ll have to set up different TFS queries.

SEP_BacklogQuery

Adjusting Kanban Workflows

While the workflow that I’m using for Tasks and Bugs would work for User Stories, it seems a little heavy to duplicate the process for Stories. I simplified the flow to make it easier to manage and for reporting status.

The flow for my Tasks and Bugs, which I’ve outlined in my previous posts, is:

  • Proposed
  • Active
  • Selected
  • In Development
  • Ready for Test
  • Testing
  • Acceptance
  • Closed.

For my User Stories, I’ve simplified it to:

  • Proposed: the story does not have all the details, yet.
  • Active: the story is well defined and is actionable.
  • In Development: the story is being developed or validated by developers
  • Testing: development has completed and the testers are running their test cases
  • Acceptance: test cases are complete and its ready for client review
  • Closed: the feature has been accepted / shipped / etc.

Note that SEP TeamWorks uses the Status column from all Work Items into its UI so I’ve repurposed my existing status definitions to simplify things.

Daily Operations

As mentioned previously, having our Kanban board as software solution allows us to query and represent the data in different ways. I use a combination of three different queries for my daily operations:

  • Product Planning: I query only User Stories which allows me to see the high-level status of the project at a glance. I heavily use Areas & Iterations (I’ll blog about this next) to help organize and plan the project.
  • Iteration Backlog: I use a hierarchical query as shown above to represent the current iteration.  This query allows me to see the detailed status of the Story
  • All Work Items: This query returns all Tasks and Bugs and it resembles the Kanban board I’ve fallen in love with. This query allows me to see bottlenecks, developer allocations, etc.

Conclusion

Having User Stories has made a big difference for how we track and organize our effort, but it’s not without its challenges. There’s a special knack to writing stories and it takes some practices to get used to the format, which I’ll have to blog about later. For now, I hope that this post shows you how easily it is to introduce Stories into your Kanban flow.

Until next time, happy coding.

Saturday, February 23, 2013

New updates for SEP TeamWorks

For the last 8 months, I’ve been using SEP TeamWorks as a front-end for my all digital, TFS-backed Kanban board. The experiment has been relatively successful, and I’m constantly revamping my model to make it fit for our style of projects. The real success of using Kanban with this tool has to be its adoption to other projects within the organization. While my hand-waving evangelism has played a part, this expansion is largely due to the position of my desk: I’ve been sitting directly between the Project Management group and the developers and see a fair amount of foot traffic every day. Every developer, project manager, designer and executive has walked by my multiple-monitor, touch screen environment and eventually, like bees to honey, they ask, “what the hell is that??”

While I’m very pleased to see Kanban adoption within our organization, I’m also very glad to see that SEP is using an iterative release cycle for their TeamWorks product. Late last year they added an auto-update feature and now surprise updates makes it feel like it’s Christmas all year long.

Here are two of my favorite new features from the latest release:

Revamped “Add new” menu

There are two ways you can add new work items inside TeamWorks.  The first way is through a main menu at the top of the screen; the second is a context-menu that you can bring up on an existing work item. This context-menu option has been completely reworked.

AddNewLinkedWorkItem

The new version opens a dialog window that let’s you specify the WorkItem Type (Bug, Task, etc) and relationship (Parent, Child, Related, etc) to the current item.

AddNewLinkedWorkItemDialog

This dialog is very similar to how it appears within Visual Studio, which means I can do more from the touch screen. The other clear advantage to using the context-menu is that the newly created work item inherits the iteration and area of the linked item.

Card Editor

This release has a brand new feature that allows you to edit the appearance of your Kanban cards. This is a very simple but very welcome addition to the tool.  The tool allows you to customize the fields and layout for each type of card, and you’re able to reuse your layouts from other queries or projects.

Here’s an example of a Task that I’ve customized by placing the Remaining Work field in the bottom right hand-corner, horizontally right-aligned.

CardEditor

Here’s a few customizations that I’ve used on my most recent project:

  • User Stories: add the Story points to the bottom of the card
  • Tasks: Original Estimate, Completed Work, Remaining Work
  • Bugs: Priority and Severity

Well, that’s all for now. I’ve got Inglorious Basterds queued up on my DVR and a nice cool drink waiting for me.

Happy Coding.

Tuesday, September 18, 2012

Marking Kanban Items as Blocked

Sometimes items in your Kanban workflow reach a state where they cannot proceed. Maybe they’re have a dependency on another item; maybe there’s an issue or pending decision. When this happens, you want to increase the visibility of these issues by marking them as blocked.

Fortunately, the SEP Teamworks tool which I mentioned in my last post, supports such a feature. Simply right-click (or on a touch device, tap-and-hold) and use the context-menu to mark it as blocked.

Kanban_marked_as_blocked

Simple, right? Well, the first time I tried this feature, the tool crashed. Turns out that you must have a Blocked field in your work item definition.

Adding this field to your work item definition is easy.

  1. Retrieve the work item definition from your TFS server using the witadmin exportwitd command:

    witadmin exportwitd /collection:<server-name> /p:<project-name> /n:Task /f:Task.xml
  2. Insert a new field definition into the FIELDS node. Note that the namespace doesn’t matter. As TFS doesn’t contain a definition for Boolean fields, you must set it up as a string with Yes/No values.

    <witd:WITD application="Work item type editor" version="1.0" xmlns:witd="http://schemas.microsoft.com/VisualStudio/2008/workitemtracking/typedef">
      <WORKITEMTYPE name="Task">
    
        <!-- edited for clarity -->
    
        <FIELDS>
    
          <FIELD name="Blocked" refname="Custom.Blocked" type="String">
            <ALLOWEDVALUES expanditems="true">
                <LISTITEM value="Yes" />
                <LISTITEM value="No" />
               </ALLOWEDVALUES>
               <DEFAULT from="value" value="No" />
          </FIELD>
    
        </FIELDS>
      </WORKITEMTYPE>
    </witd:WITD>
    
    
  3. (Optional, but highly recommended) If you want to change the Blocked field outside of the SEP Teamworks tool (such as inside TFS), you’ll need to describe the field inside the FORM node. The syntax is relatively straightforward:

    <witd:WITD application="Work item type editor" version="1.0" xmlns:witd="http://schemas.microsoft.com/VisualStudio/2008/workitemtracking/typedef">
      <WORKITEMTYPE name="Task">
    
    
        <!--edited for clarity -->
        <FORM>
    
           <Control Type="FieldControl" FieldName="Custom.Blocked" Label="Blocked:" />
    
        </FORM>
    
      </WORKITEMTYPE>
    </witd:WITD>
  4. Lastly, push your changed work item definition back to the server using the witadmin tool:

    witadmin importwitd /collection:<server-name> /p:<project-name> /f:task.xml

With these changes in place, the SEP Teamworks tool puts a visual over blocked items.

Kanban_blocked_item

My next post will look at some other handy customizations to the TFS work flow.

Tuesday, September 11, 2012

Configuring SEP Kanban board

In my last post, I showed how I’ve modified the State field of my TFS Work Item definitions to resemble my Kanban workflow.  This post we’ll take a look at how I’ve configure my digital board and highlight the pros and cons of my current approach. Maybe you’ll find this useful, maybe you’ve got some recommendations – either way, I’d love to hear from you.

Setting things up

  1. Download and install the SEP Digital Kanban board: http://www.sep.com/labs/teamworks/
  2. Run the MSI. Defaults all the way through.
  3. Run the app. You’ll need to configure the board with a few settings.
  4. Pick a server:

    sep-choose-server

  5. Select your TFS Server:

    sep-tfs
  6. Select your TFS project and select a Query that returns all your work items. I have a small query to return only Tasks and Bugs: 

    sep-project
  7. In order to get the workflow correct, you’ll need to manually order the States of the Work Item. Change the Work Item States –> Order.

    sep-options

    sep-options-panel

    The Item states should be in this order:

    • Proposed
    • Active
    • Selected
    • In Development
    • Ready for Test
    • Testing
    • Acceptance
    • Closed

  8. Depending on your Project collection, you may have additional work item definitions with their own states. You may have to turn off any states that aren’t included in our work item states. (This screen shot shows Resolved, Design and Ready states have been turned off)

    sel-visibility
  9. Set up some limits.

    sep-limits 

Cool Features

Touch enabled: While the main feature that I was interested in was representing my tasks in TFS, what sold me on this tool was the fact that it was designed for touch. My HP TouchSmart now operates as our digital kanban board.

Swim lanes: Another great feature is the ability to view the features in their own collapsible Swim Lane. There are many great uses for swim lanes such as grouping by Area, Iteration, Priority, Assigned to, Triaged, etc. Most scalar value fields can be used. What’s also great about this feature is that you can simply drag a work item into a swim lane to assign that field value. This makes it easy to keep your work items organized.

Create or Edit Work Items: The tool takes advantage of the form layouts defined in the work item definition, so you can get the same TFS Team Explorer editor experience right on your Kanban board. Large buttons at the top of the user-interface make it simple to add new bugs or tasks as they arrive, and I can open an item from a context-menu to get or edit details about the task at hand.

Caveats and Annoyances

Tasks and Bugs: Unfortunately, I’m only tracking Task and Bug work items because these are the items that I’ve customized. I would like to Use Stories where I describe the work as a high level story and then realize that effort in tasks. At the moment, I’m using TFS 2008 which doesn’t support hierarchal tasks, so I’m kind of stuck on that.  If I could track hierarchal tasks, I’m not entirely sure how I would use this tool – where should the Stories appear on the board if only some of the development tasks are complete?

No sub-columns: One of the features that this tool lacks is that ability to create sub-columns. Ideally I would like to treat Development as one column with two sub-columns (“In Development” and “Ready for Test”) and put a WIP limit on Development. Having this capability highlights testing bottlenecks and would ensure that the development team is invested in seeing their completed efforts are delivering into the client’s hands.

No central configuration: While I’m sure that the target usage for this application is to use it on a touch-device as a whiteboard replacement, the tool doesn’t offer any means to save the configuration externally or toggle between configurations. This is a minor annoyance because most of my team members are jumping on board with this tool to provide their status updates. Also, as I have multiple projects, a means to jump between configurations would be ideal.

All in all, it’s a great resource.

My next post will talk more about customizations to the Work Item definitions that support my workflow.

Friday, September 07, 2012

Using Kanban with TFS

I’ve been actively campaigning for Kanban within our organization. This means giving lunch info-sessions, lending my ear to projects that need a boost, speaking with management and project managers. What I find so fascinating is that people get charged by such a simple concept. It can’t be this easy – but it is – and it’s applicable to most projects. Really? Really.

I’m thrilled to see people “get it”, because it’s easy to draw parallels between work as a pipeline and continuous delivery. Concepts like “push-to-deploy”, continuous integration and regression testing graft directly to parts of your workflow. And while the core concepts of continuous delivery aren’t prerequisites to Kanban, they are certainly mutually beneficial. By leading with Kanban, it’s easier to see value proposition of continuous delivery.

A common theme from all my discussions is I strongly recommend teams “resist the urge to replace a whiteboard with software”. Software can be a trap if applied too early to the process. Pick the wrong tool and you’ll spend your time worrying about tooling rather than the issues that are preventing you from delivering value. Nothing beats the immediate, tactile capabilities of a post-it note moving from one column to another. Focus on the workflow, foster adoption within the team, optimize and then find software to fit your needs. It should rarely be the other way around.

Unless of course, your team is remote.

I’ve heard of some innovative ways to get around this limitation, including a webcam pointed at your Kanban board. This seems like too far a stretch for me, and it’s time for my project to move our spreadsheets and post-it notes into a more centralized digital format.

While there are many cloud-based solutions, a critical feature for me is to own the data. And integrate directly with Visual Studio. (Okay, two key features). Team Foundation Server does Work Items. Let’s start there.

Customizing Work Item Definitions

Out of the box, the definition for Task has all the fields we need to implement our Kanban workflow. The main customization that we need to make is to the State field: we’ll model the various stages of our workflow using this field.

Our current workflow looks something like this:

  • Proposed: This is our backlog
  • Active: Items that will be included in this release.
  • Selected: These are items that we will develop next.
  • In Development: Items being actively worked on.
  • Ready for Test: Development is complete and is pending deployment or verification.
  • Testing: Items that are being validated by testers.
  • Acceptance: Items at are ready for client review.
  • Closed: Completed items.

We’ll need to model these various states in our work item definition, which we can retrieve from TFS using the following command line:

witadmin exportwitd /collection:https://<tfs-server-name> /p:<project-name> /n:Task /f:task.xml

Our State field is represented in the work item definition as:

<witd:WITD application="Work item type editor"
           version="1.0"
           xmlns:witd="http://schemas.microsoft.com/VisualStudio/2008/workitemtracking/typedef">

  <WORKITEMTYPE name="Task">

    <FIELDS> <!—- simplified for clarity -->

      <FIELD name="State" refname="System.State" type="String" reportable="dimension">
        <HELPTEXT>The workflow state of the task</HELPTEXT>
      </FIELD>

    </FIELDS>

    <WORKFLOW> <!-- simplified for clarify -->

      <STATES>
        <STATE value="Proposed" />
        <STATE value="Active"/>
        <STATE value="Selected" />
        <STATE value="In Development" />
        <STATE value="Ready for Test" />
        <STATE value="Testing" />
        <STATE value="Acceptance" />
        <STATE value="Closed" />
      </STATES>

    </WORKFLOW>

  </WORKITEMTYPE>
</witd:WITD>

Transitioning between States

One of the powerful features of customizing the work item definition is the ability to define rules that govern how the item transitions between states.  There is a bit overhead to define these transitions and it can become cumbersome if you have a lot of states, but overall this is a good exercise to formalize what each column means and why something would move from one state to another.

State transitions are fairly easy but there are a few small caveats:

  • You must provide a default state (transitioning “” to “Proposed”)
  • Each transition must have a default reason, plus any number of additional reasons.
  • Any transition that is clearly not defined is not supported.

There are a lot of neat features that you can define here, some of which will have to wait for another post, but here’s a quick excerpt that demonstrates state transitions:

<witd:WITD application="Work item type editor" 
           version="1.0" 
           xmlns:witd="http://schemas.microsoft.com/VisualStudio/2008/workitemtracking/typedef">
    <!-- edited for clarity -->

    <WORKFLOW>
        <!-- snip -->
        
        <TRANSITIONS>
            <TRANSITION from="" to="Proposed">
              <REASONS>
                <DEFAULTREASON value="New" />
              </REASONS>
            </TRANSITION>
            <TRANSITION from="Proposed" to="Active">
              <REASONS>
                <DEFAULTREASON value="Scheduled in Release" />
              </REASONS>
            </TRANSITION>
        
            <!-- not shown:
                proposed -> development
                proposed -> closed

                active -> selected
                active -> development
                active -> proposed
                active -> closed
    
                selected -> development
                selected -> active

                development -> ready for test
                development -> selected
                development -> active

                ready for test -> testing
                ready for test -> development

                testing -> acceptance
                testing -> ready for test
                testing -> development
                testing -> selected
                testing -> active

                acceptance -> closed
                acceptance -> active

                closed -> active
             -->
    </WORKFLOW>

</witd:WITD>

With our customizations in place, we can push our work item definition back to TFS:

witadmin importwitd /collection:<server-name> /p:<project> /f:task.xml

Now when we open a Task definition, we see that the State transition drop-down is constrained by the transitions we’ve defined and the Reason column is prepopulated with our reasons.

WITD-state-transitions

Visualizing TFS Work Items in a Kanban tool

TFS has a rich API and many integrations available (especially with Office stack) but I certainly wouldn’t have gone through all of this trouble if there wasn’t a replacement for my whiteboard and post-it notes.

I recently found this free tool, provided by SEP, that does most of things I want. Because the application supports touch, I’m able to put my HP TouchSmart to good use.

Kanban-example

My next post will talk more about setting up the SEP teamworks tool.

Monday, February 20, 2012

My first month with Kanban

Just before the Christmas break, I took over an existing project that was approaching a major milestone. It's a great project: a small team, working with a high profile client to build a modular MS Surface application that ships a new release every few months.

You would think that taking over a project in the late stages of development would be a bad thing, however it's been fairly positive experience. Although the project suffered in the beginning as our bandwidth was reduced while I was ramping up, the opportunity to introduce a fresh set of eyes with a different perspective has allowed the team to innovate and challenge their assumptions (I’d like to think it’s been for the better).

One initiative that I felt that the project needed was some form of Agile methodology.  Although we had a set of high level stories that we knew had to be implemented, there was no breakdown of the tasks or ability to gauge progress. Despite this obvious need, I knew Agile was going to be a tough sell: the project has a highly dynamic, fast pace environment where requirements and tasks change daily. Adopting a full-on Agile agile process seemed too formal. I might be able to establish a backlog, maybe some task estimates -- but trying to establish planned iterations with client involvement? Not a chance. Besides, I'd likely wind up losing a good chunk of my day managing the status of tasks and justifying burn down charts to management.

This was a great opportunity to try something new. I had heard about Kanban before, but didn't understand it enough to put it into practice. I found this great eBook (free) that explains Kanban by outlining the differences between Scrum and Kanban. I highly, highly recommend. Download it now.

The following is an account of how we put Kanban in place…

Kanban in a nutshell

Kanban is a very lean process methodology that is based on a subset of agile/scrum. Whereas Scrum comes with rules about how to work with iterations and stories, Kanban comes with nearly no rules at all. In fact, you often have to add your own rules to Kanban in order to align it to your project/organization.

At a high level, Kanban is all about visualizing the work as a workflow on a "Kanban board". User stories are often depicted using sticky-notes, and they travel through the workflow on the board. Although you could easily do the same thing with Scrum, the key difference is that a scrum board would be reset at the end of the iteration. Kanban doesn't have the concept of iterations, so the board is the project.

Visualizing our Workflow

Before we could dive into realizing our project in a sticky-note form, we collaborated a bit to determine what our development workflow would look like. Although our process utilizes graphic designers from time to time, we decided to limit the scope of our Kanban board to the development pipeline only.

As mentioned previously, our process for this project isn’t very well defined. The majority of our work is based on a SharePoint list that our client has access to, and we log defects and work items there. Each day, we pull things from the list and work on them until we reach a deadline for a release or have completed all tasks to the best of our ability. It’s not the best system, but it’s just enough to work. The team decided that the best place to start with our Kanban workflow was in the middle where we were most involved, so we’d have two columns to represent the development tasks:

  • In progress: Items that the team is actively working on.
  • Done: Items that the team has completed development and are ready for testing.

Of course, our process doesn’t end once development is complete. From here, we package up a release and deploy it to a local Surface device in the office where other members of the team can see our progress. The team decided that we should do this more frequently and with some consistency, so we added another column for this:

  • Surface: Items that have been deployed to a local surface machine for verification. If we identify problems with any of these features, they go back to the beginning of our process.

Eventually, once all the stories and tasks have been completed, we bundle up our changes and deploy it to our client’s surface machine for their testing and feedback. The process repeats until the client accepts the current package and it is released to their Surface machines. We represent these steps with another two columns:

  • Client: Items that have been deployed to the clients’ location. It’s rare that stories are rejected by the client, but there’s often a lot of feedback that gets added to the beginning of our pipeline.
  • Live: Items that have shipped.

At this point in the exercise, we’ve captured how things are currently executed on this project. The astute will recognize that the beginning of the workflow is lacking definition – I’ve not outlined how we account for tasks that aren’t actively being worked on, or how effort is prioritized. I’ve deliberately left this out, partly because I feel the pipeline has two distinct parts (an incoming and outgoing flow) but mainly because it’s a good way to explain one of Kanban’s core features: work-in-progress limits.

Keeping the team focused by establishing Limits

Clearly, our workflow will have a column that represents a backlog for our remaining effort. Although I could add it to the beginning of our workflow, which would make our Kanban board look a lot like a standard Scrum burn-down chart, there isn’t anything that would prevent us from falling into our old habits. In a highly dynamic project like this one, there’s a constant barrage of client requests and other noise that is beset with a sense of immediate urgency – most tasks get assigned to a developer and go straight to an “In Progress” state as they arrive. Essentially, if there aren’t any rules about when things are allowed to be considered In Progress, then there aren’t any reasonable expectations for the schedule of that work. This creates a real problem with managing client expectations and keeping track of what tasks people are actually working on. While there’s something to be said about multi-tasking, a team without focus gets nothing done.

To resolve this issue, we take advantage of one of Kanban’s unique features. At the top of our In Progress column, we add a number that represents the maximum limit for items in that column. This is known as a work-in-progress (WIP) limit. Since developers only have one head and two hands, we assume that developers should only work on one task at a time. This is easy math for a team of two developers.

By limiting our In Progress items to 2 we put a spotlight on the items that the team is actively working on, but this also creates a visibility problem about which items will be worked on next. To help visualize the priority of items, we add another column:

  • Accepted: These are the work items that the developers will work on after they complete the In Progress tasks. We refer to them being as “Accepted” because the development team has reviewed the tasks and has committed to delivering these features.

To prevent the Accepted column from getting bloated, we give it a WIP limit of 4. This ensures that the developers have just enough prioritized items in their queue to keep them busy for the day. We could go higher, but 4 is a very manageable number.

Adding Rules and Events

As mentioned previously, Kanban doesn’t have many rules and you need to add your own to suit your needs. Here are a few rules that we’ve established:

  • Our project manager is not able to manage any of the columns except the Accepted and Backlog columns. This means he plays a key role in helping to direct the work towards client expectations. Indirectly this also means that he’s not able to interfere with work in progress.
  • When the Done column has enough items (we’re still trying to figure out a proper WIP for Done) we halt development and deploy what we have to our local Surface machine. We do this to keep the amount of regression testing to a minimum.
  • Before we deploy to the client environment, we must validate the work items against the local surface machine. This ensures that we use the same installation media, and use the items in our Surface column as a list of regression tests. We are actively looking to automate our deployment process so that we can deploy more frequently.

Results so Far

There are some really interesting side-effects from implementing our Kanban board:

Kanban-board

  • The most notable impact is that our stand-ups have changed considerably. Rather than spending 15-20 amnesiac minutes trying to remind each other what each of us did 16 hours ago, we spend a few minutes reviewing the current items on the board and prioritizing next steps. We then talk about the issues. It’s a night-and-day difference from previous projects.
  • Having the board highly visible on our wall simplifies communication and makes managing the tasks much easier. We get immediate feedback when a developer finishes a task because they have to get up from their desk and physically move their item to another column. And since we have an Accepted column that contains prioritized ready-to-go items, there’s never any guess work or wasted allocation trying to figure out what developers should do next.
  • The visual representation of the board makes it easy to gauge the health of the pipeline. If the Accepted column is full at the beginning of the day, I’ll likely get a few extra cycles to focus on development tasks. If the Accepted column is low, I can quickly scan the backlog and determine if we’re going to have any issues.
  • There’s some interesting metrics that come out of tracking the status of the board daily, something I’ll likely write more about in another post. But in short, I count up the number of items in each column at the beginning of the day and add a small journal note that summarizes the changes in the board.  From this I can easily track our last deployment and where the backlog changed.

Challenges

There are a few minor challenges we’ve encountered:

  • From a project management perspective, it’s difficult to gauge remaining effort in hours. Although we’ve applied a sizing rank to our tasks (Small, Medium, Large – where large is 8 hours), it’s difficult to glance at the board and determine if we’ll make a target date. The Kanban eBook suggests that all post-it notes on the board should have the same weight which would solve this problem, but we are still struggling how to group and organize our tasks to fit within this concept.
  • The board only works when we’re all in the office. I’ve adjusted the columns in our SharePoint list to align closely to our board, and there is some duplication of effort trying to keep the board in sync. The system that I’ve found to work best is to ensure that all tasks are born within SharePoint, and they’re considered Pending until there’s a post-it note on our Kanban board. Periodically throughout the week, I spend a few minutes updating our SharePoint list to reflect the board’s current status. The SharePoint list acts as a digital memory that can provide additional details and attachments, but the board is the most accurate representation. There are still some discrepancies between the two systems, and we either need some formal process or tweaks to make this work better.

Conclusion

For the last month, the team has been putting the final touches on a release which has involved completing some features and fixing defects. This type of work changes daily and our Kanban board has allowed us to visualize the outstanding work in a meaningful way. We’ve started having scheduled retrospectives to gather feedback and adjust our process. Generally, that feedback has been positive and we’ve course corrected a few times for the better. The true test will come shortly when we start working on the next release – will the Kanban format work or should we adopt formal sprints?

As a final word, I feel it’s important to mention the feedback that I’ve received from other teams. Some glance at our board and are intrigued, others look at the post-it notes as archaic technology and feel that our process could be brought into the 21st century with some software package. While there may be a great software package for this, the eBook warns about this – all developers will have this reaction. Our Kanban board requires no licenses, doesn’t take time to boot, responds instantly to tactile input and is always on. Besides, there is no equivalent software package that allows you to ceremoniously march a stack of post-it notes around the room as they go live.

Happy coding.